Bathroom: Day 8

This morning I took a shower in the master bathroom for the first time in several years. It seemed to work just fine. The trap in the vanity leaks a little bit. Other than that, the only new thing in there was they put the light fixture up over the mirror. I didn’t think it warranted a picture though.

In the hall bath they tiled above the tub and tiled the floor. I think it turned out great with the line at eye level and the bull nose along the edges, though it seems like the bull nose is a slightly different color. I’m not sure if it matters or not.

Anyway, it looks good. They should be able to grout tomorrow and maybe install the sink and toilet. Stanley says the electrician and drywall guys will come tomorrow and finish up their work.

In another room completely, Mom says Miguel may be able to start putting tile down in the back room this week. I’ve decided to use Susan’s terra cotta tile with a brown rectangle accent. So they might start tearing out the pink carpet tomorrow if I can get all of the furniture moved out of that room tonight. That will be the last project for a while.

Continue reading “Bathroom: Day 8”

Bathroom: Day 6

Friday since Stanley was out of town and couldn’t work on getting the floor ready for the tilers, nothing happened. This weekend Carol was in town and I went with her and mom to pick some “beige” tile for the hall bathroom, along with an inset at eye level and bullnose along the edges. I’d have been just as happy with white, but everyone seems to think the main bathroom should look nicer than mine.

Stanley got back today and things got back in gear. In the master bathroom, the toilet, shower door, and shower fixtures were installed. The vanity was put in place but doesn’t have fixtures yet. That’s still pretty good because they were saying the shower door had to be custom made and wouldn’t be here until this Friday. Mom had bought a shower rod at Target on Friday so I could use it, but I didn’t open it so now I should be able to take it back.

The toilet seems to work fine. It’s a little anti-climatic given the raves this thing got. It doesn’t flush quite as powerfully or as quickly as I thought, but anything that seemed super powerful would also make a lot of noise. It does fill pretty quickly. Also, I had thought it had dual flush (where you can use 0.8 gallons instead of 1.6 gallons for flushing liquids), but apparently that’s not the case.

Continue reading “Bathroom: Day 6”

Bathroom: Day 5

They didn’t do anything on the master bathroom, but instead worked on gutting the hall bath today. Miguel told me that this time he was prepared and had a jackhammer he had borrowed from Stanley.

When I got home today the bathroom was definitely gutted. There was some rotten wood near the corner of the tub. Stanley is out of town, so we will probably wait until he gets back so he can decide how to proceed. Even if he keeps most of this wood, he will have to bring the height of the floor up some.

One significant problem is the house now has no functioning toilets or showers, so I am stuck at Susan’s house regardless. The shower will work pretty soon, but the shower door won’t be ready until the end of next week (they measured yesterday, which I guess is for the best since they only got the tile up yesterday). . They said on Monday they should be able to get the new toilet and install that and, failing that, will install the old toilet temporarily. And I will need to put up a shower curtain for the shower until the door is ready This is a little annoying. The toilet should have probably been at the house already since I told Stanley what I wanted and where to get it last Friday. Today they tried to buy one in Tucker but it was about $50 more than the place I had recommended and for which Stanley said he had an account.

Continue reading “Bathroom: Day 5”

Bathroom: Day 4

This morning the sheetrock guy showed up while I was taking the dogs for a walk.

When I got home there were two Latino guys on my front steps. I asked them where their car was and they said they rode the subway. I said “Me too, but I drove from the station.” I even showed them my MARTA card. I asked if they wanted a ride to MARTA. But since MARTA means something in Spanish, I don’t think they knew what I was talking about. Turns out they spoke very little English. Maybe they were actually telling me where they got lunch when they said “Subway.” They did communicate that their cell phone wasn’t working so I let them use mine and they called Miguel. He was there a few minutes later. We all went in and looked at the day’s work.

Continue reading “Bathroom: Day 4”