My kitchen has always needed some work. The green and white formica counters, the dripping faucet, the stained and cracked cast iron sink, the pink wallpaper, etc. I didn’t want to do a total renovation, but I figured I could update some parts. I went to Home Depot and talked to a kitchen designer and we charted out a makeover that would replace the counter, sink, faucet, flooring, and add a tile backsplash for about $2700. For the counter, the basic level is laminate or formica. Then there is a big jump in price to about 3 times that price where you can get granite, quartz, or Corian. I figured formica would be okay and less maintenance than granite. I picked out a Delta faucet that got good reviews and a thicker than average stainless steel sink from Kohler. One problem with the cast iron sink was that if I dropped a glass or dish in the sink, it was pretty much a gonner, but stainless is a little bouncier and hopefully will save some glassware. The same thinking was behind getting a vinyl floor instead of ceramic tile.
A few weeks ago, a guy came and measured for the counter and praised my choice of laminate over granite. He said the counter should be read “week after next” which would have been the week before last. The official estimate was 2-3 weeks. 3 weeks was last week. I was hoping they would install it on Columbus Day since I would be off anyway, but they sent me a notice saying it would be last Tuesday, the day after Columbus Day.