I saw a link today for an article about work starting on the 17th Street bridge. I clicked on it because I had worked on coming up with plans for the repair. When I got to the article, there is an embedded video and the picture shows a finger pointing to the plans. I drew that!
Here’s the article.
The caption for one of the pictures says:
Georgia Department of Transportation engineers have drawn up plans to reinstall decorative fencing on the 17th Street bridge using what they say is a more secure method involving bolts secured by nuts and steel plating. Previously, the structure was attached by a fast-set epoxy.
But it wasn’t “engineers” plural, it was just me! Actually the vast majority of the plans were drawn by our consultant under the original contract for the 17th Street bridge, and all I did was modify those drawings.