« Bathroom: Day 6 | Main | Bathroom: Day 8 »

Tuesday May 1, 2007

Bathroom: Day 7

In the master bathroom the sink was hooked up and is running. Also the medicine cabinet was installed.


Vanity

In the main bath, Stanley finished working on the floor and the tub was put in. That means tiling should be able to start tomorrow. Mom picked up the pedestal sink at Home Depot today, so things are coming together. Stanley had picked out the tub. I was thinking maybe I should have opted for a cast iron tub instead of Americast by American Standard (sheet metal and fiberglass with a porcelain finish). At Home Depot I saw an Americast tub and it seemed kind of flimsy, but with it installed it seems very solid and I can't tell any difference between it and cast iron.

Tub Sink

Previously: Day 6

Next: Day 8